Inspection Status: Approved
Inspection History: PLUMBING - PROGRESS
Permit Number - T12CM00376
Inspection Description - PLUMBING - PROGRESS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/19/2013 | PLUMBING - PROGRESS | Approved | IVRS - Inspection :* | |
06/13/2013 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :* | |
06/07/2013 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :* | |
06/06/2013 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
06/06/2013 | PLUMBING - PROGRESS | Not ready for Inspection | COULD NOT LOCATE CONTRACTOR - PROVIDE A CONTACT #. 4035 - PROVIDE CODE APPROVED SUPPORTS ON PLASTIC DRAIN LINES. SUPPORT AT CONNECTIONS, CHANGES OF DIRECTION, AND DO NOT EXCEED 4'. |
|
05/24/2013 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :* | |
05/24/2013 | PLUMBING - PROGRESS | Partial Approval | INSTALL COVER AT BW VALVE ACCESS COMPLETE NOTED ITEM SHOW ALL PAPERWORK |
|
04/30/2013 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
04/30/2013 | PLUMBING - PROGRESS | Not ready for Inspection | CLAMP OVER HEAD RO PIPING. RO DRAIN REQ AB. COMPLETE PIPE INSULATION. PLUG ANY UNUSED FLOOR SINKS. SUPPORT RD DRAIN AT CASE. | |
04/29/2013 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
04/29/2013 | PLUMBING - PROGRESS | Not ready for Inspection | PROVIDE BACKFLOW PROTECTION FOR HYBRID EVAP ROOF TOP UNITS MAKE-UP WATER OR PROVIDE 3RD PARTY LISTING IF UNITS HAVE INTERNAL PROTECTION. ALSO PROTECT HOSE BIBS. PROVIDE TRAP SEAL PROTECTION FOR FD AT ROOF HATCH, EXTENT VTR. ICE AND RO EQUIPMENT HAVE NOT YET BEEN INSTALLED. SOLDIER LEAK AT WH. PIPE SUPPORTS AT RO EQUIP LOCATION. |
|
03/07/2013 | PLUMBING - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
03/07/2013 | PLUMBING - PROGRESS | Denied | COMPLETE ALL WORK PROVIDE ALL REQUIRED DOCUMENTATION. PROVIDE A CITY APPROVED COPY OF SITE SEWER AS REQUESTED. TYPE B VENT TERMINATION REQUIRES 8' CLEARANCE FROM SIDE WALL. GAS REGULATOR VENTS REQ 3' CLEARANCE FROM SIDE WALL. GAS REGULATOR VENTS REQ 3' CLEARANCE FROM IGNITION SOURCE. DEEP SEAL TRAP SPECIFIED AT ROOF FD ALSO PROVIDE TRAP SEAL PROTECTION. WATER TEST AND CAULK ALL FIXTURES. PROVIDE LISTED CO PLUGS TO RECIEVE SCREWS. SEAL & TIGHTEN ALL PLUGS. SEAL ALL JOINTS OF PIPE INSULATION. INSPECTION STOPPED |
|
12/18/2012 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :* |