Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date |
Description |
Inspector |
Results |
Comments |
| 05/02/2013 |
BUILDING PRE-SLAB |
|
Approved |
IVRS - Inspection :* |
| 12/19/2012 |
BUILDING PRE-SLAB |
|
Partial Approval |
IVRS - Inspection :*COMPACTOR SLAB AT GL:L/1.5-2.2;BATTERY STORAGE PAD AT GL:L/1 OK TO POUR PROGRESS AREAS. |
| 11/20/2012 |
BUILDING PRE-SLAB |
|
Partial Approval |
BLDG PRE SLAB POWER AREA #2 OK TO POUR |
| 10/24/2012 |
BUILDING PRE-SLAB |
|
Partial Approval |
loading dock ramps at GL: k/2.2-3.5 detail #13 page s2.1 -ok to pour |
| 10/10/2012 |
BUILDING PRE-SLAB |
|
Partial Approval |
INTERIOR SLAB (SE) : GL: H/1-5.4 5.4/H-K; K/1-5.4; 1/K-L- OK TO POUR PROGRESS AREA |
| 10/02/2012 |
BUILDING PRE-SLAB |
|
Partial Approval |
freezer slab at gl:c/1.6; detail #14, page s2.1. cmu walls at 18"8" gl; a/1.6-2.6; cmu wall at 16'8" gl: k/2.2-3; 2.2/k-l-ok to grout progress areas. freezer slab at gl: 1/f2.5-f.75 details @14.16 page s2.1-ok to pour slabs |