Permit: T12CM00376

Parcel: 136100930


Addresses:

2711 S HOUGHTON RD

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
05/02/2013 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
11/27/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 11 CAISSON LIGHT POLE CAGES
11/14/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
11/06/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval LOADING DOCK FOOTINGS AT GL: L.2/ 1.2.5 TO BE CONFIRMED BY SPECIAL INSPECTION- OK TO POUR PROGRESS AREAS
10/23/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval EXCAVATION/ LAYOUT REBAR LOADING DOCK
SIDE WALK GL: H/5.4-7; LOADING CLOCK RAMP
GL; K/2.2-3.5 OK TO POUR PROGRESS AREA
10/16/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 4 COLUMN REINFORCED FOOTINGS AT GL: A/3.2-3.7 OK TO GROUT
10/03/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 3 DOCK LEVELER PITS- DETAIL #10, PAGE 5-2- OK TO POUR
09/11/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 4 F6 AT GL:A/3.3-3.8; DETAIL #1 PAGE S6.01
CMU WALLS :AT 24'8" GL:8/F.5-H: AT 20'8"-GL:1/ D.5-J.3: L/1-2.2 AT 12'8" OK TO GROUT PROGRESS AREAS
09/10/2012 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*
09/05/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval PEDISTAL FOOTING AT GL: L/2-OK TO POUR
09/04/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval GL: H.5/5.4-7; K/ 5.4-7: OK TO POUR PROGRESS AREAS
08/31/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval LOADING DOCK WALL; DETAIL #8, PAGE S2 GL:L/3.75-2.2
08/30/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval LOADING DOCK WALL; GL:K/2.2-4;2.2/K-L
08/20/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval FOOTINGS AT LOADING DOCK EXTERIOR WALL GL;K/5.4-7;7/3.5-7.GL:L/1.5-1;1/K-L;COLUMN FOOTINGS AT GL:J/4-5(2FOOTINGS);OK TO POUR PROGRESS AREAS.
08/17/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval GL: K/5.4-7, 5.4/H-K DOCK FOOTING: GL:L/2.2-3.5- OK TO POUR FOOTINGS
COLUMN FOOTINGS (14) -GL:D.5/2-7 E/2-7; OK TO POUR FOOTINGS: NOTE: FOOTINGS RETAINED RAIN WATER- VACUUMED OUT; SOIL TESTED AREAS APPEARED TO BE ABLE TO RECEIVE CONCRETE.
08/16/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval COLUMN FOOTINGS (10) GL: 7/F-D.5(3) 6/E-D.5(2); 3/F-J (3); 2/F-G (2).
FOOTINGS: (INTERIOR LOADING RAMP) K/3.5-2.2; 2.2/K-L
SE CORNER STEP DOWN L/1-1.5, 1/L-K; C/2-2.6
OK TO POUR PROGRESS AREAS
01020- MASONRY PRE-GROUT. PARTIAL-STEM WALLS AT 16"
GL; C/1-2-6,1/C-L: OK TO GROUT PROGRESS AREAS.
08/14/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval LOADING DOCK FOOTINGS :GL: H/7-5.4; 5.4/H-K
08/13/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval GL: COLUMNS C2,F2; C5/F4- C/1.6-2.6
FOOTING: GL: 1/A.0-K.5; DRAIN PIPE DETAIL #17, PAGE 52.1 -OK TO POUR PROGRESS AREA.
*NOTE: FOOTINGS AT GL: 8/C-1T AND C/ 1-8 CORRECTIONS WERE OBSERVED BY SPECIAL INSPECTION; POURED 8-10-12
08/11/2012 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection NOT READY- MISSING #3 REBAR AT DOOR OPENINGS, DETAIL #5 PAGE S2.1: DETERMINE LOCATION OF DRAIN PIPE OF FOUNDATION WALL: DETAIL #17, PAGE S2.1
08/09/2012 EXCAVATION/LAYOUT REBAR & ZON Partial Approval FOOTING AT GL: 8/ C-H
DETAILS # 1 PAGE 52; #17 PAGE 52.1 OK TO POUR PROGRSS AREAS