Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2012 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 04/13/2012 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) INSTALL TRACER WIRE ON BLDG SEWER 2) REMOVE ROCKS, SUPPORT PIPING AND A FIRM BED IS REQUIRED 3) CLEANOUT ON TRAP ARM IS REQUIRED TO BE END OF LINE OR ABOVE FLOW LINE 4) BLAKE TEE IS ALLOWED ON VERTICAL PIPE ONLY 5) CORRECT SLOPE |