Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - PROGRESS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2012 | BUILDING - PROGRESS | Approved | IVRS - Inspection :* | |
| 03/23/2012 | BUILDING - PROGRESS | Partial Approval | IVRS - Inspection :* 1) PLACE REBAR IN FOOTING; NOT TO COME IN CONTACT WITH SOIL |
|
| 03/20/2012 | BUILDING - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CARPORT TO BE REMOVED 2) POSTS MAY NOT BE DIRCT BURIAL. PROVIDE 12" X12" FOOTER 2 #4'S EACH WAY. PROVIDE POST BASE ALL POSTS 3) POSTS AT ALL HEADER JOINTS 4) REMOVE FRIEZE BOARD TO INSPECT POINT OF ATTACHMENT AT EXISTING WALL TO RAFTER 5) PROVIDE POST CAP TO RAFTER CONNECTIONS 6) CONTRACT TEP FOR DIRECTION ON SEVICE DROP WITHIN 7' FLAT ROOF |
|
| 03/19/2012 | BUILDING - PROGRESS | Denied | IVRS - Inspection : There is no access to the site.| 920* 1) NO ONE HOME 2) NEED PLANS AND PERMIT TO CONDUCT INSPECTION 3) PLEASE CALL TO RESCHEDULE |