Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - PROGRESS
Permit Number - T12CM00168
Inspection Description - PLUMBING - PROGRESS
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/12/2013 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
04/12/2013 | PLUMBING - PROGRESS | Approved | IVRS - Inspection :* | |
04/12/2013 | PLUMBING - PROGRESS | Not ready for Inspection | NON POTABLE HOSE BIB CAP OR SIGN FREEZE PROTCTION. TEST REPORT | |
04/11/2013 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :* | |
04/10/2013 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :* | |
04/09/2013 | PLUMBING - PROGRESS | Partial Approval | PROVIDE BACKFLOW PROTECTION BE HYBRID COOLING TOWER 2/ CHSM FOES, AS REQUIRED PER 608.1. PROVIDE CLEAN OUT AT 360 DEGREE CHANGE OF DIRECTION IN OVERHEAD DRAIN OR REMOVE 90 DEGREE FITTINGS. CONNECT RO DRAIN AND PHARMACY TO TAIL PIECE UP STRM OF TRAPS. PROVIDE PROPER TRANSITION FORM CPVC AT MAIN RO SYSTEM, APPROVED SUPPORTS ON DRAIN. CORRECT LEAKS. UNDER LAVITORIES OK. PROVIDE APPROVED CO PLUGS. |
|
04/01/2013 | PLUMBING - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999*MISSING CLEAN OUT AT PHARMACY SINK. ALL CO PLUGS SHALL BE LISTED TO RECEIVE SCREWS REMOVE COVERS UNDER LAVS AND DFS. INSTALL TRAP SEAL DEVICES WHERE REQ. 1002.4 INSTALL GAS OVEN W/ SAFETY CABLE AND DRAIN. PROVIDE 2" AIR GAPS. PROVIDE ALL BACK FLOW ASSEMBLIES SHOWN ON PLAN: BOTH OVENS AND RO SYSTEM. PROVIDE STERILIZATION ON ALL WATER PIPING INCLUDING RO PIPING AND YARD WATER. SHOW DOCUMENTATION. TEST AND CERTIFY ALL BACKFLOW ASSEMBLIES. 312.9.2 REMOVE UNSAFE HOSEBIB. INSTALL VACUUM BREAKERS ON ALL HOSE BIBS. 2HR INSPECTION W/ TONE FROM SUNSLATE. RICK W/ WALMART AND STRAIGHT BUILD |
|
03/28/2013 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
03/20/2013 | PLUMBING - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
03/15/2013 | PLUMBING - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* CALL FOR AND HAVE APPROVED ALL REQUIRED INSPECTIONS. YOUR INSP HISTORY SHOWS NO INTERMEDIATE APPROVALS FOR DMV TESTING. PROVIDE HISTORY FOR ALL AREAS OR PROVIDE A WATER TEST ON SYSTEM. ADDRESS ALL OUTSTANDING ISSUES. SEE HISTORY. REMOVE THE UNSAFE HOSE BIB LOCATED BELOW THE ROOF AT ACCESS HATCH. BIB IS NOT ACCESSIBLE AND HAS IMPROPER BACKFLOW DEVICE FOR THIS APPLICATION. EXTEND BTR TO 6' ABOVE HUMAN ACCESS AREA NEXT TO HATCH. PROTECT ALL PLASTIC FROM UVRAYS. COMPLETE WORK ABOVE CEILING. PROVIDE TRAP PRIMERS FOR ANY DRAINS THAT DO NOT RECEIVE CONTINUOUS DISCHARGE. TEST RO WATER SYSTEM AND CARBON DIAMOTOR CONDENSATE DRAINS. |
|
03/13/2013 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
03/12/2013 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :* | |
01/24/2013 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :*MENS, WOMENS, FAMILY RESTROOMS- OK TO INSULATE WALLS | |
01/23/2013 | PLUMBING - PROGRESS | Not ready for Inspection | IVRS - Inspection :*CHANGE FROM LAST INSPECTION |