Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/16/2013 | FIRE SPKLR - FINAL | Approved | ||
| 04/29/2013 | FIRE SPKLR - FINAL | Denied | 1. Correct sprinkler coverage in the front patio lobby area one head is 11 feet off a wall. 2. Correct sprinkler coverage on the 1st floor ceiling has been changed from a drop solid type to a ceiling that now has holes you did not move heads but they are now 20 inches from deck, they can only be 12 inches from deck. 3. Inspector test valve needs to be plumed to the outside of the riser room. 4. Label riser room door with following words "RISER ROOM" |
|
| 04/26/2013 | FIRE SPKLR - FINAL | Not ready for Inspection | 1. Rescheduled for Monday 4/29. | |
| 12/04/2012 | FIRE SPKLR - FINAL | Not ready for Inspection | 1. Need to tie sprinkler system into monitoring system. |