Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2012 | FIRE SPKLR - FINAL | Approved | ||
| 09/14/2012 | FIRE SPKLR - FINAL | Denied | 1.) Correct upright sprinkler coverage around the duct work for paint booth inside 2.) Shall monitor sprinkler system completely not just paint booths (tamper and water flows) will need to add a tamper and water flow switch to old riser system. 3.) Shall move shut off valves for paint booth and mixing booth according to NFPA sec 8.15.1.1.7 states "All control valves shall be located readily accessible and free of obstructions" 9 3/4" width between both booths is not accessible. |