Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2013 | FIRE SPKLR - FINAL | Approved | ||
| 07/23/2013 | FIRE SPKLR - FINAL | Denied | 1. Hallways for 3rd, 5th, & 6th floors need to be adjusted for coverage in one of the following ways: a.) Uprights added b.) Gap filled in the T-Bar ceiling. 2. Replace painted uprights on 4th and 7th floors. 3. Painted heads in rooms 1304 and 1517 4. 6th floor study lounge needs new head. 5. Standpipe caps needed for 5th, 6th and 7th floors. |