Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T12BU00832
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/13/2014 | GRADING - INTERMEDIATE | Approved | ||
02/12/2014 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT CHANGES AND OR CONCERNS AT THIS TIME WILL DECIDE ON GRADING OUTSIDE OF GRADING LIMIT |
|
02/10/2014 | GRADING - INTERMEDIATE | Continued | AWAITING ANSWER FROM ENGINEER AND ENGINEERING REVIEWER ON CHANGES MADE TO THE SITE/GRADING. SEE NOTE #14 ON GRADING CONDITIONS: 14) Grading / Disturbance Limits shall be maintained and no disturbance outside of grading limits will be allowed. Stop Work Order may be issued if disturbance occurs outside of approved grading limits as shown on approved grading plans. There shall be no disturbance, construction vehicle traffic or parking, or stockpiling outside of approved Grading Limits as shown on Grading Plan, and there shall be no disturbance of Brichta Wash drainageway, unless for limited disturbance as approved on the plans, for stormwater purposes, as discussed with PDSD Inspector, and as shown on approved plans. Any disturbance without authorization may result in Stop Work Order and/or other penalties. |
|
01/31/2014 | GRADING - INTERMEDIATE | Continued | PRIOR TO FINAL GRADING APPROVAL: 1)) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT THE SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLAN. 2) PROVIDE AN AS-BUILT DRAWING 3) STABILIZE THE BARROW PIT AND STOCKPILE AREAS CLEARED DURING CONSTRUCTION OF THE SITE PER DEV. STD 11-01.0 AND YOUR APPROVED PLANS. 4) PER THE DESIGN CRITERIA FOR RET/DET BASINS, SECURITY BARRIERS MUST BE PROVIDED AT THE TOP OF ALL BASIN SLOPES STEEPER THAN 4:1 WHERE WATER DEPTHS EXCEED 2 FEET. 5) COMPLETE ALL SITE/GRADING/LANDSCAPING SHOWN ON THE APPROVED PLANS. 6) PROVIDE ASSURANCE THAT THE CONSTRUCTED RET/DET BASIN WILL PERFORM WITH IN DESIGN STANDARDS 7) CLOSE OUT STORM WATER PERMIT AND REMOVE CONSTRUCTION DEBRIS AND EQUIPMENT. |
|
01/24/2014 | GRADING - INTERMEDIATE | Partial Approval | NO SIGNIFICANT CHANGES AND/OR COCNERS AT THIS TIME | |
01/07/2014 | GRADING - INTERMEDIATE | Continued | 1) ENSURE ANY/ALL CHANGES TO THE SITE/GRADING ARE SHOWN ON AN APPROVED GRADING PLAN 2) PROVIDE AN AS-BUILT PLAN FOR FINAL GRADING INSPECTION 3) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD, PRIOR TO FINAL GRADING APPROVAL 4) PROVIDE A POST CONSTRUCTION PERC TEST FOR ALL RET/DET BASINS ON SITE. 5) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
12/13/2013 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME | |
11/27/2013 | GRADING - INTERMEDIATE | Continued | 1) RE-ESTABLISH SEDIMENT CONTROLS ALONG THE WEST PERIMETER - STORM WATER CONTROLS REQUIRED UNTIL SITE IS STABILIZAED 2) SWEEP UP TRACKING OFF ADJACENT ROADWAYS 3) A POST CONSTRUCTION PERC TEST IS REQUIRED ON RET/DET BASINS PRIOR TO SITE APPROVAL. |
|
11/25/2013 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT CHANGES/OR CONCERNS AT THIS TIME | |
11/13/2013 | GRADING - INTERMEDIATE | Continued | NO CHANGES AND/OR CONCERNS AT THIS TIME | |
10/30/2013 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT CHANGES AN/OR CONCERNS AT THIS TIME ASK SUPERINTENDENT ABOUT REPLACING HAND RAILING ALONG EXISTING CONCRETE DRAINAGE CHANNEL NO SIGNIFICANT STORM WATER CONCERNS |
|
10/28/2013 | GRADING - INTERMEDIATE | Continued | INSPECTED COLLAR FOR STORM WATER PIPE TRANSITION FROM HDPE TO RCP - OK | |
10/02/2013 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME | |
09/18/2013 | GRADING - INTERMEDIATE | Continued | 1) REMOVE OR REPAIR/REPLACE SEDIMENT CONTROLS ALONG THE EAST/NE PERIMETER OF SITE. 2) REPAIR EROSION DAMAGE ALONG BASIN SLOPES @ SOUTH SIDE OF SITE. 3) WEIR AT EAST BASIN NEEDS TO BE MODIFIED SO STORM WATER TRAVELS OVER THE WEIR BEFORE GOING AROUND IT.(BASIN SPILLWAY DETAIL, (T) ON CO.3) (18" PIPE) 4) PRIOR TO FINAL APPROVAL NEED PERC TEST IN BASINS. 5) PERFORM STORM WATER SELF INSP/SWEEP TRACKING |
|
08/28/2013 | GRADING - INTERMEDIATE | Continued | 1) INSPECTED AND TOOK PICTURES OF THE HEADWALL/WINGWALLS FOOTINGS FOR THE INLET SIDE OF THE 48" HDPE STORM PIPE. DETAILS AND EOR APPROVAL WAS USED TO CONSTRUCT THE FOOTING AND RE-BAR. 2) SITE ACCESS ROAD HAS BEEN PAVED 3) ROADWAY VERTICAL CURB AND ADJACENT CURB OPENINGS HAVE BEEN CONSTRUCTED. |
|
08/14/2013 | GRADING - INTERMEDIATE | Approved | NO CHANGES AND/OR CONCERNS AT THIS TIME CONTRACTOR WILL BE INSTALLING STORM WATER DRAINAGE PIPE HEADWALL THIS AND NEXT WEEK |
|
08/07/2013 | GRADING - INTERMEDIATE | Continued | 1) CLEAN UP TRACKED SOIL OFF OF WEST ENTRANCE/EXIT 2) REPAIR/REPAIR SEDIMENT CONTROLS ALONG THE EXISTING DRAINAGE CHANNEL 3) SEDIMENT CONTROLS MUST REMAIN IN PLACE UNTIL THE SITE IS STABILIZED 4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 5) CONTRACTOR IS WORKING ON SUBGRADE FOR PRIVATE ROADWAY. |
|
07/31/2013 | GRADING - INTERMEDIATE | Continued | NO CHANGES AND/OR CONCERNS AT THIS TIME | |
07/09/2013 | GRADING - INTERMEDIATE | Continued | 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) NO SITE WORK BEING DINE AT THIS TIME 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED AND THE NECESSARY REPAIRS ARE MADE. 4) SWEEP UP SOIL OF ADJACENT ROADWAYS ROUTINELY |
|
06/26/2013 | GRADING - INTERMEDIATE | Continued | NO CHANGES AND/OR CONCERS AT THIS TIME | |
06/12/2013 | GRADING - INTERMEDIATE | Continued | 1) INSPECTED RE-BAR LAYOUT AND FORMS FOR CONNECTING WING WALLS AND SIDEWALKS ON ACCESS BRIDGE FROM SILVERBELL ROAD - PICS TAKEN 2) ENSURE CONCRETE WASH OUT IS CONTAINED ON SITE 3) NO OTHER STORM WATER CONCERNS AT THIS TIME 4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED |
|
06/10/2013 | GRADING - INTERMEDIATE | Continued | 1) INSPECTED WING WALL RE-BAR LAY OUT FOR ACCESS BRIDGE FROM SILVERBELL RD. PICTURES TAKEN/DENSITY TEST COPY GIVEN 2) INSPECTED RET/DET BASINS ALONG EAST SIDE OF SIDE. 3) LOOKED AT TWO 36" STORM PIPE 4) NO SIGNIFICAT STORM WATER CONCERNS AT THIS TIME |
|
06/06/2013 | GRADING - INTERMEDIATE | Continued | 1) BRIDGE DECK WAS POURED THIS AM, TOOK PICS. 2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
06/05/2013 | GRADING - INTERMEDIATE | Continued | 1) INSPECTED REBAR LAYOUT FOR BRIDGE DECK, INSTALLED PER APPROVED PLAN. - OK TO POUR CONCRETE, PICTURES TAKEN 2) TOOK PICTURES OF TWO 36" HDPE STORM PIPE INSTALLED ALONG THE CENTER OF THE SITE. 3) PROVIDE A COPY OF THE SPECIAL INSPECTION RESULTS FOR THE BRIDGE CROSSING 4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
06/03/2013 | GRADING - INTERMEDIATE | Continued | INSPECTION PER HIGH ON PAGE C3.0. | |
05/30/2013 | GRADING - INTERMEDIATE | Continued | LOOKED AT AND APPROVED THE DRAINAGE PIPE AS NOTED IN THE LOCATIONS ON THE CONTRACTORS PLANS FOR THIS DATE. | |
05/23/2013 | GRADING - INTERMEDIATE | Continued | LOOKED OVER THE PLANS FOR THE EAST SIDE ABUTMENT STEEL PLACEMENT PRIOR TO LEAVING THE OFFICE. MET RON LEDONNE ON SITE TO LOOK OVER THE WORK THAT IS BEING DONE AT THIS TIME. SHOWED HIM THE PLACEMENT OF THE REBAR FOR THE STRUCTURE AND ADVISED HIM OF WHAT THEY ARE ANTICIPATING ON DOING WITH THIS POUR AND FUTURE POURS. WE ADVISED THE CONTRACTOR THET HE NEEDED TO PLACE SOME ADDITIONAL SPACERS IN AREAS WHERE THE REBAR WAS TOO CLOSE TO THE WALLS. HE PROVIDED THE SPACERS, THE AREA IS READY FOR THE PLACEMENT OF CONCRETE LATER ON TODAY. | |
05/22/2013 | GRADING - INTERMEDIATE | Continued | 1) CONTRACTOR INSTALLING SIDE WALLS FOR ENTRANCE BRIDE OVER EXISTING DRAINAGE CHANNEL 2) FOOTINGS HAVE BEEN DUG AND INSTALLED PER APPROVED PLAN. 3) REBAR LAYOUT/AND PLACEMENT PER APPROVED PLAN. 4) ENSURE STD SPECS FOR HIGHWAY BRIDGES IS USED FOR INSTALL/CONSTRUCTION. 5) TOOK PICTURES OF FORMS AND REBAR PLACEMENT 6) TOOK COPY OF SPECIAL INSPECTION BY PATTISON EVANOFF ENG. FOR RECORDS 7) OK FO CONCRETE. 8) NO STORM WATER CONCERNS |
|
05/14/2013 | GRADING - INTERMEDIATE | Continued | 1) REVIEWED SITE/GRADING PLAN WITH SUPERINTENDENT 2) WALKED SITE AND INSPECTED STORM WATER CONTROLS 3) ENSURE MAINTENANCE IS PERFORMED ON SEDIMENT CONTROLS PER YOUR PLAN. 4) NEED TO VERIFY AND INSPECT INSTALL OF STORM WATER PIPE PER PLAN |
|
05/03/2013 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME CONTRACTOR PREPPING AREA FOR DRAINAGE CHANNEL CROSSING |
|
05/02/2013 | GRADING - INTERMEDIATE | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME NO CHANGES TO SITE/GRADING |
|
04/23/2013 | GRADING - INTERMEDIATE | Continued | 1) CONTRACTOR ROUGHING-IN RET/DET BASIN 2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED |
|
04/18/2013 | GRADING - INTERMEDIATE | Continued | 1) CONTRACTOR WORKING SOIL AND PREPPING FOR CONSTRUCTION OF BLDG PAD. 2) CONTRACTOR DOING UTILITY WORK 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. SEDIMENT CONTROLS ARE INSTALLED |
|
04/10/2013 | GRADING - INTERMEDIATE | Continued | CONTRACTOR WORKING SOIL FOR CONSTRUCTION OF BLDG PADS AND SETTING GRADES |