Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2013 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) INSTALL SEDIMENT CONTROLS (WADDLE) PER YOUR STORM WATER PLAN AND DISCUSSIONS MADE ON SITE 4-1-13 2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE 3) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE 4) POST A COPY OF YOUR SIGNED NOI ON SITE 5) PERFORM ROUTINE STORM WATER SELF INSPECTIONS PER YOUR PLAN AND DOCUMENT THEM 6) SWEEP UP ANY TRACKED SOIL AS NEEDED 7) CALL FOR INSPECTION PRIO TO INSTALL OF STORM PIPE AND CATCH BASINS 8) NPPO PRE INSPECTION APPROVED |
|
| 03/19/2013 | ENGINEERING PRE-CONSTRUCTION | Continued | NO ACTIVITY, NO CONSTRUCTION |