Inspection Status: Approved
Inspection History: FIRE SPKLR - UG PIPING FLUSH
| Date |
Description |
Inspector |
Results |
Comments |
| 01/24/2013 |
FIRE SPKLR - UG PIPING FLUSH |
|
Approved |
|
| 11/09/2012 |
FIRE SPKLR - UG PIPING FLUSH |
|
Partial Approval |
1. approved the ug pressure test for club house fdc and fire line. |
| 10/18/2012 |
FIRE SPKLR - UG PIPING FLUSH |
|
Partial Approval |
everything is flushed except the club house. |
| 10/02/2012 |
FIRE SPKLR - UG PIPING FLUSH |
|
Cancelled |
ON SITE CANCELLED BY CONTRACTOR |
| 09/26/2012 |
FIRE SPKLR - UG PIPING FLUSH |
|
Partial Approval |
bldg 2,4 |
| 09/20/2012 |
FIRE SPKLR - UG PIPING FLUSH |
|
Partial Approval |
1. bldg14-15 flushed. |
| 09/19/2012 |
FIRE SPKLR - UG PIPING FLUSH |
|
Partial Approval |
bldg 5-7-11-12-13 complete |