Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
Permit Number - T12BU00303
Inspection Description - FIRE - ALARM FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/17/2012 | FIRE - ALARM FINAL | Approved | Permit paid -Demolation done - All fire doors in elevator lobbies fixed | |
07/30/2012 | FIRE - ALARM FINAL | Partial Approval | It is okay to start the demolition of the existing fire alarm wiring and equipment. | |
07/25/2012 | FIRE - ALARM FINAL | Correction Required | Tested Stairwell pressures North South Floor 22 .17 .17 Floor 11 .17 .23 Floor 5 .31 .29 Floor 2 .51 .55 Floor 2 to high over 30 pounds to open doors IFC 10088.1.1.2 Door Swing On all floors elevator lobbies have problems with doors closing and latching need to repair or replace doors so all can close and latch, Need to test fire pump to FACP Need to test new valves installed and repairs made to tamper and flows |
|
07/25/2012 | FIRE - ALARM FINAL | Partial Approval | Partial approval given all testing done final will be given when inspections for after hours is paid for. | |
07/02/2012 | FIRE - ALARM FINAL | Cancelled | IVRS - RI canceled | |
06/25/2012 | FIRE - ALARM FINAL | Cancelled | Not ready to test repairs call and cancelled Still need to test smoke removel system for stairs Still need to test fire pump to panel. |
|
06/15/2012 | FIRE - ALARM FINAL | Correction Required | Tested flow and tamper switches on floors 1 to 24 after adjustments were made all passed with the exception of floor 11 tamper is failing will need to replace switch, also inspectors test valve is very hard to open and close valve hard to seat need to repair or replace. Tested tampers and flow switches on levels P-1 to P-3 again after adjustment were made some passed but the following needs to be repaired or replaced: 1. Tamper switch P-1 inside parking garage by stairwell 3 failed 2. Tamper switch P-1 inside stairwell 3 failed 3. Flow switch P-3 stairwell 3 failed 4. Tamper switch on the fire pump test header failed 5. Flow switch on the main line in the fire pump room keeps sticking repair or replace. |
|
06/14/2012 | FIRE - ALARM FINAL | Correction Required | Floor 25 - Top of stairs need to add a smoke - Passed Floor 24 - Need to turn up sounders to quite - Passed Duct detectors tested - passed but A/C unit #9 is missing parts and not a working A/C unit, A/C unit #8 shut down. Elevator recall - Passed Floor 23 - Stair well 1 smoke detector added at top of stairs - Passed Floor 22 - North hall need to add horn/strobe to quite, horn/strobe added- Passed Tested smoke detector in the returned air plenum - Passed Floor 21 - Tested smoke detector in the returned air plenum - Passed Floor 20 - Box phones not working in stairwells - Passed Phone boxes in stair 1 and 2 tested - Passed Tested smoke detector in the returned air plenum - Passed Floor 19 - Tested smoke detector in the returned air plenum - Passed Floor 18 - Tested smoke detector in the returned air plenum - Passed Floor 17 - Tested smoke detector in the returned air plenum - Passed Floor 16 - West tenant space stairwell add smoke and horn/strobe (keep smoke 3 feet away from all exhaust and intake vents) - Passed Tested smoke detector in the returned air plenum - Passed Floor 15 - West tenant space stairwell add smoke and horn/strobe (keep smoke 3 feet away from all exhaust and intake vents) - Passed Tested smoke detector in the returned air plenum - Passed Floor 14 - West tenant space stairwell add smoke and horn/strobe (keep smoke 3 feet away from all exhaust and intake vents) - Passed Tested smoke detector in the returned air plenum - Passed Floor 12 - Tested smoke detector in the returned air plenum - Passed Floor 11 Elevator room needs horn/strobe - Added horn/strobe - Passed Test A/C #7 Duct detector - Passed North east break room added horn/strobe - Passed West conference room added horn/strobe - Passed North training room added horn/strobe in 2nd half - Passed Floor 10 Elevator room needs horn/strobe, Added horn/strobe - Passed Repair fire fighter phone, phone repaired - Passed Floor 9 - Tested smoke detector in the returned air plenum - Passed Tested elevator recall - Passed Floor 8 - South file room strobe bad, horn/strobe replaced - Passed Tested smoke detector in the returned air plenum - Passed Tested elevator recall - Passed Floor 7 - Tested smoke detector in the returned air plenum - Passed Tested elevator recall - Passed Floor 6 - Tested smoke detector in the returned air plenum - Passed Tested elevator recall - Passed Floor 5 - Tested smoke detector in the returned air plenum - Passed Tested elevator recall - Passed Floor 4 - No strobes, but vice worked, horn/strobes worked - Passed Tested elevator recall - Passed Ducts were tested on 06/13/2012 - Passed Floor 3 - - Tested elevator recall - Passed In generator room fire phone failed, phone repaired - Passed Floor 2 - Stair well 3 need smoke detector on top, smoke added to top - Passed Lobby floor - Passed Parking level 1 - Tested okay & duct detector passed Parking level 2 - Tested okay Parking level 3 - Duct detector for A/C #6 passed (reported activation to FACP) but the A/C unit did not shut down therefore failed, tested A/C #6 again unit did shut down - Passed Still need to test all tampers and flow switches Still need to check signals for the fire pump operation Still need to check signals for generator operations Still need to do 24 hour stand-by battery test and 5 min run time Still need to check on the operation of the smoke exhaust systems, fans failed to operate during testing (all stairwells). |
|
06/13/2012 | FIRE - ALARM FINAL | Correction Required | Floors 1-9 - Elevators fail to recall when system was set off Floor 9 - Tested okay Floor 8 - South file room strobe bad Floor 7 - Tested okay Floor 6 - Tested okay Floor 5 - Tested okay Floor 4 - No strobes, but vice worked. Floor 3 - In generator room warren phone failed Floor 2 - Stair well 3 need smoke detector on top Floor 1 - Tested okay Parking level 1 - Tested okay & duct detector passed Parking level 2 - Tested okay Parking level 3 - Duct detector for A/C 6 passed (reported activation to FACP) but the A/C unit did not shut down therefore failed Floors 3 & 4 tested duct detectors passed Still need to test duct detectors on upper floors Still need to done 24 hour stand-by battery test Still need to check on the operation of the smoke ventilation system |
|
06/12/2012 | FIRE - ALARM FINAL | Correction Required | All box phones failed in stairwells Floor 10 Elevator room needs horn/strobe - repair fire fighter phone Floor 11 Elevator room needs horn/strobe North training room needs horn/strobe on other side of folding doors Floor 12 - Okay Floor 14 - West tenant space stairwell add smoke and horn/strobe (keep smoke 3 feet away from all exhaust and intake vents). Floor 15 - West tenant space stairwell add smoke and horn/strobe (keep smoke 3 feet away from all exhaust and intake vents). Floor 16 - West tenant space stairwell add smoke and horn/strobe (keep smoke 3 feet away from all exhaust and intake vents). Floor 17 - Okay Floor 18 - Okay Floor 19 - Okay Floor 20 - Box phones not working in stairwells Floor 21 - Okay Floor 22 - North hall need to add horn/strobe to quite Floor 23 - Okay Floor 24 - Need to turn up sounders to quite Floor 25 - Top of stairs need to add a smoke Still need to check out all duct detectors on the above floors listed Need to check all stairwells venting or pressurization system? |