Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 06/05/2019 |
GRADING - INTERMEDIATE |
|
Approved |
|
| 09/14/2012 |
GRADING - INTERMEDIATE |
|
Continued |
GOT WITH BILL ABOUT HAND RAIL ONLY ON ONE SIDE OF SIDEWALK THAT IS OVER 5%. |
| 09/05/2012 |
GRADING - INTERMEDIATE |
|
Continued |
NO CHANGE FROM LAST INSPECTION. |
| 08/29/2012 |
GRADING - INTERMEDIATE |
|
Continued |
WALKED SITE WITH DAVE AND BILL SIDE WALK ON SOUTH SIDE OF LOT #1 OVER 2% CROSS SLOPE DAVE SAID REPAIRS NEED TO BE MADE BEFOR MASTER GRADING PERMIT CAN BE APPROVED. HAND RAIL NEEDED AT TURN AT SIDE WALK FROM STREET TO HOUSE.SIDE WALK FROM STREET TO HOUSE ON SOUTH SIDE OF HOUSE MAY NEED HAND RAIL ALSO DAVE CHECKING WITH RON BROWN. ALL CHANGES TO APPROVED PLANS NEED AS-BUILTS. |
| 03/27/2012 |
GRADING - INTERMEDIATE |
|
Correction Required |
LOT HAS BEEN GRADED FOR THIS PERMIT, BUT NO OTHER WORK HAS BEEN STARTED AT THIS TIME. A PRE-CON FOR THIS SITE WILL NEED TO BE CALLED IN PRIOR TO ANYMORE WORK BEING COMPLETED. |