Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T12BU00091
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/02/2015 | GRADING - FINAL | Approved | ||
09/09/2015 | GRADING - FINAL | Continued | CHECKED ON PROGRESS OF STORM PIE AND CATCH BASIN INSTALL - NO CONSTRUCTION TODAY, SITE MOSTLY COMPLETED WILL RE-INSPECT | |
09/03/2015 | GRADING - FINAL | Continued | POURING THREE CATCH BASINS SHOWN ON PLANS. FORMS AND RE-BAR PER PLANS | |
08/24/2015 | GRADING - FINAL | Continued | PRIOR TO FINAL APPROVAL PROVIDE APPROVED AS-BUILTS THAT SHOW WHAT WAS CONSTRUCTED AND A CERTIFICATION FROM THE ENG. OF RECORD. | |
08/21/2015 | GRADING - FINAL | Continued | 1) CONTRACTOR INSTALLED LATERAL STORM DRAIN LINE (C0RRUGATED HDPE) WITH A ONE WAY FLOW VALVE AND TIED INTO THE EXISTING SRP LINE. 2) ENSURE PLASTIC TO STEEL CONNECTION IS GROUTED AND SEALED PRIOR TO COVER 3) PROVIDE PICTURES OF THE FINISHED PIPE CONNECTION OK TO COVER AT THAT POINT |
|
08/19/2015 | GRADING - FINAL | Continued | 1) CONTRACTOR HAS DUG A TRENCH FOR STORM PIPE AND IS READY TO TIE-IN TO TWO EXISTING 48" PUBLIC DRAINAGE LINES. 2) ENSURE THE COT TRANSPORTATION DEPT IS AWARE OF THE WORK AND YOU ARE IN COMPLIANCE WITH THIER STANDARDS. 3) ENSURE INVERT ELEVATIONS IN THE FIELD AND ON THE APPROVED PLANS ARE THE SAME. 4) COMPACT TRENCH, BED PIPE, SET AT GRADE AND CALL FOR RE-INSPECTION. 5) SHOW INSTALLATION OF THE FLAPPER VALVE AT THE STORM DRAIN MANHOLE SHOWN ON THE APPROVED PLANS |
|
08/13/2015 | GRADING - FINAL | Continued | 1) MET WITH NEW SUB-CONTRACTOR ON SITE. ADDITION WORK WILL BE DONE AT THE SITE, ADDING A STORM DRAINAGE LINE WITH CATCH BASINS AND TIE-IN TO PUBLIC STORM DRAIN. 2) ENSURE INSPECTIONS ARE APPROVED PRIOR TO COVERING PIPE. 3) PERMIT WILL NOT BE FINALED UNTIL ALL ASPECTS OF THE PROJECT ARE COMPLETED |
|
09/23/2013 | GRADING - FINAL | Continued | NO CHANGES, NO ACTIVITY, AND NO FINAL GRADING CALLED IN FOR INSPECTION | |
08/19/2013 | GRADING - FINAL | Continued | NO CHANGES | |
07/12/2013 | GRADING - FINAL | Continued | AWAITING FOR FINAL GRADING INSPECTION TO BE CALLED IN, WALKED SITE | |
06/06/2013 | GRADING - FINAL | Partial Approval | SITE APPEARS TO BE COMPLETED, CONTRACTOR NEEDS TO CALL IN FOR FINAL GRADING INSPECTION | |
05/21/2013 | GRADING - FINAL | Continued | 1) SITE WORK COMPLETE 2) LANDSCAPING COMPLETE 3) CALL IN FOR FINAL GRADING INSPECTION |
|
04/30/2013 | GRADING - FINAL | Continued | SITE NOT 100% COMPLETE | |
04/23/2013 | GRADING - FINAL | Continued | MAJORITY OF SITE WORK DONE, AWAITING COMPLETION OF CONSTRUCTION | |
04/17/2013 | GRADING - FINAL | Continued | 1) COMPLETE ALL SIDEWALKS AND ACCESS WAYS 2) COMPLETE ALL LANDSCAPING 3) REMOVE ALL CONSTRUCTION EQUIPMENT AND MATERIAL FROM PUBLIC ACCESS |