Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T12BU00091
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/17/2013 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
09/20/2012 | ENGINEERING PRE-CONSTRUCTION | Continued | 1) ENSURE SEDIMENT CONTROLS ARE INSTALLED PER THE APPROVED SWPPP 2) SWEEP UP TRACKED SOIL OFF PUBLIC ROADWAYS ON A ROUTINE BASIS. 3) CALL FOR RE-INSPECTION WHEN SEDIMENT CONTROLS HAVE BEEN INSTALLED OR IF YOU HAVE ANY CONCERNS OR CHANGES TO THE APPROVED PLANS. 4) ENSURE YOU PERFORM STORM WATER SELF INSPECTIONS PER YOUR PERMIT REQUIREMENT AND DOCUMENT THEM |
|
09/18/2012 | ENGINEERING PRE-CONSTRUCTION | Continued | MET WITH GREG AND ASKED THAT HE POSTPONE THE PRE-CON TILL TOMORROW WHEN MIKE RUSSO WILL BE BACK. HE WILL HAVE THE PRE-CON WITH MIKE SO THAT HE WILL KNOW WHAT MIKE NEEDS FROM HIM FOR THE STORMWATER PERMIT THAT HE RECEIVED YESTERDAY. |