Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/30/2011 | PLUMBING - FINAL | Approved | ||
| 12/14/2011 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) PVB IS GOOD-PROVIDE CERT 2) REMOVE AVB DOWNSTREAM OF PVB 3) ALSO REMOVE OR CORRECT CODE VIOLATION AT FRONT HB 4) LOCK DOWN ALL HOSE BIB VAC BREAKERS 5) OK TO COVER YARD 6) YARD WATER ONLY-NO SEWER |
|
| 12/13/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) WATER LINE ONLY-NO SEWER 2) YARD LINE OK TO COVER, INSTALL S.O.V. AT ? TERMINATE TRACER WIRE INTO METER BOX 3) PROVIDE CODE APPROVED BACKFLOW PROTECTION 4) AN ATMOSPHERIC VACUUM BREAKER MAY NOT HAVE VALVES DOWN STREAM 5) ALL HOSE BIBS REQUIRE VACUUM BREAKERS |