Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/23/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/22/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE CORRECT GROUNDING AND BONDING |
|
| 11/21/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PLEASE LEAVE MESSAGE WITH CONTACT PHONE NUMBER AND COMPLETE ALL ITEMS FOR CORRECTION FROM 11/18/11 INSPECTION NOTE: FOR YOUR SAFETY RE-INSTALL GROUNDING SYSTEM AND WATER BOND AT PANEL AND PROVIDE GAS PIPING SYSTEM BOND |
|
| 11/18/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SECURE GAS PIPING AT WATER HEATER AREA NOTE: CHECK THE WATER HEATER TEMPERATURE AND PRESSURE RELIEF AND VERIFY FUNCTIONAL 2) SECURE THE GAS PIPING AT THE FURNACE 3) RETURN AIR AT FURNACE TO BE SEALED OFF FROM COMBUSTION AREAS OF FURNACE 4) SUPPORT AND SECURE PIPING IN ATTIC 5) PROVIDE BONDING OF BLDG GAS PIPING SYSTEM 6) HAVE SHUT OFF VALVES ON SITRE 7) OK TO COVER EXTERIOR |
|
| 11/17/2011 | PLUMBING - FINAL | Cancelled | IVRS - RI canceled |