Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/29/2011 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 11/21/2011 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) PE REQUIRES 18" COVER MINIMUM 2) PLAN INDICATES 1 1/4 TO FIRST APPLIANCE 3) TEST ENTIRE SYSTEM TO 10 PSI 4) WATER HEATER NEEDS TO BE INSTALLED FOR GAS SERVICE, WITH PROPER VENTING AND RELIEF DRAIN TERMINATION 5) FURNACE REQUIRES MINIMUM 3/4", ALSO INSTALL SEDIMENT TRAPS 6) PROVIDE B-VENT WITHIN 6" OF COMBUSTIBLES AND TO POINT OF TERMINATION |