Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/13/2012 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 06/26/2012 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* INSTALL ENCLOSURE AT WATER HEATER PRESSURE GAUGE MUST BE IN 1/10TH LB INCREMENTS. USE A 15LB GAUGE VENT CONNECTOR NOT PROPERLY CONNECTED TO DRAFT DIVERTER PROVIDE MIN 1" CLEARANCE WHERE VENT PASSES THROUGH ROOF EXTEND VENT TO MIN 5' ABOVER DRAFT DIVERTER BRICKS ARE NOT APPROVED FOR PIPING SUPPORT |
|
| 05/24/2012 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* |