Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/28/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/25/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) TEST TO BE ON ENTIRE GAS SYSTEM, HOLDING MINIMUM 10 PSI FOR 15 MINUTES WITH NO LOSS OF PRESSURE 2) PROVIDE APPROVED GAS SHUT OFF VALVES AT ALL APPLIANCES 3) PROVIDE A TEMPERATURE AND PRESSURE RELIEF DRAIN FOR WATER HEATER, (COPPER, CPVC & GALVANIZED PIPE) TERMINATING DOWN 4) DRAFT HOOD TO BE IN PLACE AND PROPERLY CONNECTED AT WATER HEATER 5) INSTALL WATER HEATER VENT CAP CORRECTLY |