Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/21/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE CORRECT BLDG GROUND FOR ELECTRIC SYSTEM 2) PROVIDE BONDING PER NOTE #2 10/19/11 AND SEE NOTE #4 FOR CORRECT FURNACE VENTING |
|
| 10/19/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PRIME THEN TAPE ALL NEW AND EXPOSED UNDERGROUND FITTINGS & TOOL MARKS ON PIPING 2) PROVIDE BONDING OF BLDG GAS SYSTEM 3) PROVIDE APPROVED GAS SHUT OFF VALVES AT FURNACE & DRYER LOCATION 4) PROVIDE APPROVED VENTING SYSTEM FOR FURNACE, NO TAPE ON VENT CONNECTOR JOINTS, ALL JOINTS MADE UP CORRECTLY DBL WALL VENT THRU CEILING AND ROOF PROPERLY FLASHED ON ROOF TOP WITH DBLE WALL VENT TO TERMINATION AT APPROVED VENT CAP EXTENDING TO 3' ABOVE TOP OF COOLER INTAKE WHEN WITHIN 10' OF COOLER INTAKE |