Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/25/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/20/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE BLDG GAS SYSTEM BONDING 2) PROVIDE AN APPROVED VENTING SYSTEM FOR BOTH WATER HEATER AND FURNACE 3) PROVIDE A RIDGID NIPPLE THRU THE FURNACE SIDE WALL 4) EXTEND PIPING FOR FURNACE DOWN TO VALVE TO MAKE FLEX REACH 5) PROVIDE FLASHINGS FOR ROOF PENETRATIONS 6) PROVIDE APPROVED GRAVITY DRAIN FOR NEW WATER HEATER TEMPERATURE AND PRESSURE RELIEF DRAIN |