Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/24/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/21/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) GAS CARD AT METER |
|
| 10/20/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TEST TO HAVE MINIMUM 10 PSI IN ENTIRE SYSTEM AND HOLD FOR 15 MINUTES WITH NO LOSS OF PRESSURE 2) ROOF FLASHING TO BE MADE WEATHER TIGHT AT ROOF 3) VENTS FROM WATER HEATER AND FURNACE WITHIN 10' OF COOLER INTAKE TO BE MINIMUM 3' ABOVE TOP OF COOLER INTAKE WITH APPROVED DBL WALL VENT PIPING AND CAP 4) SECURE GAS PIPE IN FURNACE CLOSET 5) PROVIDE AN APPROVED VENT SYSTEM FOR WATER HEATER 6) SECURE GAS PIPE AT WATER HEATER AND PROVIDE CLEARANCE FROM PIPT OT REMOVE WATER HEATER 7) PROVIDE AN APPROVED WATER HEATER TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING SYSTEM |
|
| 10/19/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) YARDLINE OK; REMOVE BRICKS PRIOR TO COVERING 2) CORRECT UNSANITARY SEWER CLEANOUT 3) CORRECT B-VENT OF WATER HEATER; UPSIDE DOWN AND EXTEND ABOVE COOLER 4) SECURE VENT CONNECTIONS WITH SCREWS |
|
| 10/17/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |