Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/11/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) FURNACE VENT TO BE MADE UP AT SINGLE TO DBL WALL VENT CONNECTION 2) PROVIDE APPROVED GAS PIPING TO OVEN AND APPROVED GAS SHUT OFF VALVE 3) PROVIDE BONDING OF BLDG GAS PIPING SYSTEM 4) EXTEND VENTS FROM FURNACE/WATER HEATER FULL SIZE DBL WALL VENT PIPING TO 3' ABOVE AIR INTAKE WHEN WITHIN 10' |