Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/03/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) TEST TO BE IN PLACE HOLDING MINIMUM 10 PSI WITH NO LOSS OF PRESSURE FOR 15 MINUTES 2) UNION TO BE ABOVE FINISH GRADE AND UNDERGROUND PIPE, FITTINGS AND TOOL MARK AT REPAIR LOCATION TO BE PIED PRIMED THEN COVERED WITH PIPE TAPE TO ACHEIVE 40 MIL THICKNESS OF WRAP 3) WATER HEATER VENT TO BE INSTALLED IN DIRECTION OF FLOW WITH DBL WALL VENT PIPING INNER LINER INTACT THRU CEILING AND ROOF 4) HAVE APPROVED GAS SHUT OFF VALVE ON SITE FOR STOVE 5) SUPPORT GAS PIPING AT ROOF TOP UNIT. PLEASE HAVE LADDER ON SITE |