Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2011 | PLUMBING - FINAL | Approved | ||
| 10/27/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) REINSTALL WATER HEATER AND RECONNECT WATER AND GAS 2) SUPPORT VERTICAL PIPPING AND ROOF TOP PIPING 3) PENETRATIONS REQUIRE FLASHING 4) INSULATE EXPOSED PIPING 5) VACUUM BREAKER ON HOSE BIB |