Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2011 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 10/05/2011 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. ALL WORK MUST BE COMPLETE BEFORE FINAL WATER HEATERS TO BE PROTECTED FROM ELEMENTS ALL VENTS TO BE RUN ALL WATER PIPING TO BE COMPLETE WATER HEATER INSTALLATION TO BE COMPLETE EXTERIOR WALL PENETRATIONS SEALED PROVIDE SAFE ACCESS TO ROOF PROVIDE ACCESS TO INSIDE RESIDENCES SEDIMENT TRAPS MAY NOT EXTEND TO CONCRETE 3/4" GAS TO EXTEND TO WATER HEATER AT GUEST HOUSE WHERE IS PERMIT FOR NEW YARDWATER PIPING AND WHO INSPECTED IT? THIS MAY NOT BE A COMPLETE LIST CONTINUED NOT READY MAY RESULT IN REINSPECTION FEE |
|
| 09/29/2011 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) OK TO COVER UNDERGROUND PIPE |
|
| 09/27/2011 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) GAS LINE TO GUEST HOUSE TO HAVE TRACER WIRE 2) THIS PERMIT IS FOR METER RELOCATE 3) WHERE IS THE GAS PIPING TO THE BLDG ? 4) UNIONS ARE NOT DESIGNED TO BE SEALED WITH PIPE ? OR TEFLON TAPE ON THE UNION THREADS 5) USE A 15 POUND GAUGE WITH 1/10 POUND INCREMENTATION |