Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 09/14/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) TEST TO BE AT MINIMUM 10 PSI AND HOLDING FOR A MINIMUM OF 15 MINUTES WITH NO LOSS 2) CONTACT SOUTH WEST GAS TO MAKE PIPE WRAP REPAIR AT HIGH SIDE OF METER PIPING 3) IN FUTURE YOU MUST GO DIRECTLY ON TO THE PROPERTY. NO PRIVATE PIPING IN RIGHT OF WAY (ALLEY) 4) PRIME AND WRAP ALL TOOL MARKS AND UNDERGROUND FITTINGS 5) CUT OLD PIPE STUB UP OFF LEVEL TO CONCRETE ON EXTERIOR 6) TURN ON EXTRA GAS VALVE TO FURNACE BY WATER HEATER AND TEST TO VALVE AT FURNACE 7) PROVIDE FULL SIZE 3/4" TEMPERATURE AND PRESSURE RELIEF DRAIN PIPE (COPPER, GALV AND PVC PIPING) 8) PROVIDE BONDING OF BLDG GAS SYSTEM 9) VENT FROM WATER HEATER/FURNACE TO BE DBL WALL EXTENDED TO 3' ABOVE TOP OF COOLER WHEN WITHIN 10' OF COOLER INTAKE |