Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2011 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 09/01/2011 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 08/31/2011 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) 10 PSI TEST FROM METER THRU TO (1) ROOF TOP UNIT 2) (2) SHUT OFF VALVES AT METER HAVE PIPING UP TO ROOF LEVEL THIS TESTED TO VALVE ONLY, SECURE OR CAP AT VALVES 3) TEST CONTINOUS THRU TO VALVE PRIOR TO ANSUL VALVE ONLY AND TO 3/4" PIPING TO NEW WATER HEATER 4) APPROVED PLAN SHOW 1" TO THIS UNIT, REVISE APPROVED PLAN WITH BTU'S AT EACH APPLIANCE FOR CORRECT SIZING WITH ADDITION OF 199,000 BTU DEVICE 5) WATER HEATER WILL ALLOW 2 PSI TEST WITH TEST GAUGE IN 1/10 POUND INCREMENTS THRU ANSUL VALVE TO COOKING LINE SHUT OFF VALVES 6) PROVIDE ROOF TOP ACCESS |