Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/04/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 09/13/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE ROOF FLASHINGS AT ALL PIPE PENETRATIONS THRU ROOF MADE WEATHER TIGHT (3) 2) PROVIDE WEATHER RESISTANT BLOCKING TO SUPPORT PIPING ACROSS ROOF WITH WEATHER RESISTANT SCREWS 3) PROVIDE VACUUM BREAKERS AT ALL HOSE BIBS 4) PROVIDE INSULATION ON ALL PIPING EXPOSED TO FREEZING, INSULATION TO BE SEALED & IF ARMAFLEX IS USED TO BE PROTECTED FROM U.V. EXPOSURE (PAINTED) |