Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2011 | PLUMBING - FINAL | Approved | ||
| 08/31/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE A SEDIMENT TRAP AT GAS ENTRY TO WATER HEATER 2) PROVIDE WATER HEATER TEMPERATURE AND PRESSURE RELIEF APPROVED PIPING GRAVITY DRAIN TO EXTERIOR TERMINATING AT 90 DEGREE DOWN 6" TO 24" FROM FINISH GRADE 3) REMOVE ALL TAPE FROM VENT PIPING, PROVIDE 1" MINIMUM CLEARANCE FROM COMBUSTIBLES AT ROOF LINE, SEALL ROOF JACK WEATHER TIGHT AND PROVIDE APPROVED VENT CAP AT TERMINATION |