Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/18/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE BONDING FOR NOTE #6 FROM 8/16/11 INSPECTION |
|
| 08/16/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE AN APPROVED GAS SHUT OFF VALVE AT WATER HEATER, BE SURE GAS PIPING DOES NOT BLOCK ABILITY TO REMOVE THE WATER HEATER 2) WATER HEATER VENT CONNECTOR IS DAMAGED 3) PROVIDE CORRECT VENT CONNECTOR WITH FASTENERS AT VENT JOINTS 4) FURNACE REQUIRES VENT CONNECTOR FASTENERS REMOVE ALL TAPE 5) YOUR GAS ISOMETRIC IS NOT CORRECT WHERE IS WATER HEATER/AC/FURNACE ? 6) PROVIDE BONDING OF GAS SYTEM 7) CORRECT THE WATER HEATER VENT CAP |