Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 09/19/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PE REQUIRES 18" OF COVER 2) 10 PSI AIR PRESSURE REQUIRED FOR TEST 3) TYPE B VENTING REQUIRED OUTDOORS 4) 1 SOLID PLATFORM FOR WATER HEATER SUPPORT |
|
| 08/11/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) EXPOSE NEW YARD PIPING FOR INSPECTION 2) TEST WITH APPROVED GAUGE (1/10 PSI INCREMENTATIONS) 3) CORRECT FURNACE B-VENT, INSTALL IN CORRECT DIRECTION OF FLOW 4) INSTALL WATER HEATER ON AN APPROVED BASE 5) INSTALL CORRECTLY SIZED TYPE B-VENT 6) CHECK RELIEF VAVLE 7) IS THERE A PLAN/PEMIT ON SITE ? |