Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 09/15/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE A #4 OR #6 BONDING WIRE (SOLID) 2) MAKE UP THE WYE FITTING CORRECTLY INTO THE DBL WALL VENT PIPE ABOVE WATER HEATER 3) GAS CARD AT METER |
|
| 09/06/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SECURE PIPING 2) RELIEF VALVE MAY NOT BE TRAPPED, PIPE WITH APPROVED MATERIALS 3) PE REQ 18" OF COVER 4) ROOF PENETRATION REQUIRES A FLASHING 5) REMOVE CHECK VALVE ON CW SUPPLY TO WH OR INSTALL AN EXPANSION TANK 6) BOND GAS LINE |