Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/23/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PIPING AT FURNACE IS STILL NOT SECURED. VONT CONNECTOR AT FURNACE IS OPEN AT SINGLE TO DOUBLE WALL CONNECTION AND WOULD RESULT IN CARBON MONOXIDE ROSEAGE INTO STRUCTURE. NOTE: THE CONDSATATE PUMP AT AC UNIS IS RUNNING NON-STOP. |
|
| 08/19/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. COMPLETE ALL ITEMS LISTED ON 8/16 INSPECTION 2. CONTRACTOR TO PAY REINSPECTION FEE PRIOR TO FINAL INSPECTION 3. SEE #2, 5, 6 AND #8 (8/16 INSP.) |
|
| 08/16/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) SECURE PIPE AT STOVE 2) SEAL WATER HEATER T & P DRAIN PIPE THRU BLDG EXTERIOR OPENING 3) WATER HTR DBL WALL VENT IS DEFECTIVE. REQUIRES, INNER LINER IS BEING USED AS VENT CONNECTOR 4) REMOVE THE FUTURE TEE ON ROOF OR PROVIDE REVISED APPROVED PLAN SHOWING IT 5) CAP OLD GAS PIPING 6) VENT FOR FURNACE TO BE INSTALLED WITH LOWER PIECE INTO UPPER PIECE 7) VERIFY FASTENERS AT ALL VENT CONNECTOR JOINTS, NO TAPE 8) PROVIDE BONDING AND SECURE GAS PIPING AT FURNACE |
|
| 08/11/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) UNABLE TO OPEN LOCK BOX 2) PROVIDE ACCESS TO ROOF |