Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/29/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) MINIMUM 10 PSI TEST REQUIRED 2) CHECK FOR LEAKS AND RETEST 3) PROVIDE ACCESS TO ALL AREAS |
|
| 07/29/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) FOR THE SECOND TIME, 10 PSI IS REQUIRED-YOU HAVE A LEAK 2) MAKE CORRECTION THEN CALL FOR INSPECTION. FAILURE TO COMPLY WILL RESULT IN REFEES 3) ADD A SUPPORT ON ROOF AT WATER HEATER DROP 4) SECURE SUPPORTS WITH MASTIC |