Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/15/2011 | PLUMBING - FINAL | Approved | ||
| 08/05/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) THE AREA ABOVE THE METER-BUG PROOF, WEATHER PROOF OPENINGS TYPICAL OF THE REST OF THE WALL 2) WHERE IS THE BOND BETWEEN WATER AND GAS PIPING 3) METER IS WITHIN 3' OF AN OPERABLE WINDOW 4) WHERE DOES THIS UNIT GET IT'S HOT WATER ? 5) CONTINUED NOT READYS WILL RESULT IN A REINSPECTION FEE |
|
| 08/02/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) WHERE DOES THIS UNIT GET IT'S HOT WATER ? 2) REQUIRE ELECTRIC BOND 3) SEAL EXTERIOR PIPE PENETRATIONS 4) RE-SEAL AREA ABOVE METER 5) METER SET IS WITHIN 3' OF OPENABLE WINDOW |