Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/29/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROOVIDE A 10 PSI TEST ON ENTIRE SYSTEM 2) REINSTALL BONDING CLAMP ON TO NEW PIPE 3) CORRECT VENTING OF BOTH APPLIANCES 4) FURNACE CONNECTS TO TEE BELOW WH, SECURE ALL JOINTS. GALVANIZED CONNECTORS REQUIRED 5) CHECK RELIEF VALVE FOR OPERATION AND CORRECT PIPING 6) MAKE SOV ACCESSIBLE |