Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/20/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/14/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TEST GAUGE IS DEFECTIVE, TEST TO BE ON ENTIRE GAS PIPING SYSTEM PER NOTE #1 9/29/11 INSPECTION. PLEASE VERIFY ALL CORRECTIONS FROM 9/29/11 INSPECTION |
|
| 09/29/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TEST TO BE ON ENTIRE GAS SYSTEM TO APPLIANCE SHUT OFF VALVES 2) MINIMUM BURIAL DEPTH IS 18" OF COVER ON PIPIN 3) PROVIDE PIPE TAPE PRIMER THEN WRAP ALL UNDERGROUND FITTINGS AND TOOL MARKS WITH PIPE 4) TAPE TO ACHEIVE 40 MIL THICKNESS OF WRAP 5) PROVIDE APPROVED GAS SHUT OFF VALVES AT ALL APPLIANCES |