Permit: T11PL01222

Parcel: 11446213C

Inspection Status: Approved

Inspection History: SITE - SEWER

Date Description Inspector Results Comments
12/08/2011 SITE - SEWER Approved
09/19/2011 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
09/13/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) VACUUM TESTING MANHOLE #5 AND #2 OK WITH ADRIAN DOWL ENGINEERING, MANHOLE #3 LEAKING
2) ADRIAN WILL CONTINUE TO TEST TO COMPLETION
09/12/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) ADRIAN AND NICK WITH DOWEY ENGINEERING AIR TESTING
2) PLEASE PROVIDE A COPY OF TEST LOG
09/09/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
09/08/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) BLDG 45, 47 THRU MH 6
2) PIPING INSTALL COMPLETE: NEED LETTER FOR SDR35
3) NEXT STEP; TESTING
09/06/2011 SITE - SEWER Not ready for Inspection IVRS - Inspection :*
09/06/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) LATERALS TO MH 4 FROM BLDGS 36-39 AND 41-43 OK
09/01/2011 SITE - SEWER Partial Approval IVRS - Inspection :*HCS LATERALS; 078,085,075
08/31/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) MH 6 BASE OK
2) HCS LATERAL THRU 033
08/30/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) MH 1 TO MH6 MAIN OK
2) HCS TO B29 OK
08/29/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) MANHOLE #4 BASE POUR WITH (2) 4" HCS LATERAL STUBS APPROVED 3' OUT
2) 4" HCS LATERAL FOR UNITS #70,71,72,73,BEDDING,LAGING AND TRACER TESTING AT LATER DATE
08/26/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) MH 2 BASE OK
2) HCS CONN BRANCHES THUR BLDGS 021, 090 AND 025
08/25/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
FROM H 3 THRU B017 FROM MH # 5 THRU B 011 HCS CONN OK SUBJECT TO MATERIAL CHANGE
08/24/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
08/22/2011 SITE - SEWER Partial Approval EXPOSE THE CORRECTIONS REQ ON HCS RISERS
8' BETWEEN M2 & M3 OK
M3 BASE OK
08/18/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) 8' MAIN BETWEEN 1 AND 5 OK
2) INSTALL WATER STOP AT MH BASE CONN.
3) HCS TAPS OK
4) AT BLDG POC, CEANOUTS SHOWN
5) ALL FITTINGS SHALL BE INSTALLED IN THE CORECT DIRECTION OF FLOW
08/17/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) 8" SEWER BETWEEN M1 AND M5 THRU 4" HCS CONNECTION. SADDLE TAPS OK
08/16/2011 SITE - SEWER Partial Approval IVRS - Inspection :*
1) FROM EXISTING MH WITH TAP TO MH #1 WITH STUB OUTS, AND PIPING RUN EAST, WITH HCS BRANCHES OK
2) MH BASE #1 POURED OK