Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2011 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 06/30/2011 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1) PROVIDE PIPE TAPE PRIMER AND THEN PIPE TAPE TO ACHIEVE 40 MIL THICKNESS OF WRAP AT BLDG RISER LOCATION 2) INSTALL WATER HEATER, VENTING, TEMPERATURE AND PRESSURE RELIEF DRAIN PIPING 3) PROVIDE BLDG GAS BOND |