Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/11/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) COMPLETE ALL ITEMS ABOVE |
|
| 06/30/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE SUPPORTS FOR PIPING AT ALL LOCATIONS 2) SEAL PIPE PENETRATIONS INTO BLDG 3) VENT PIPING FOR WATER HEATER TO BE ATTACHED TO DRAFT HOOD AND HAVE FASTENERS AT VENT JOINTS 4) WATER HEATER TO SIT ON FIRM FOUNDATION 5) T & P DRAIN TO GRAVITY DRAIN TO DAY LIGHT TERMINATING 90 DEGREE DOWN 6" TO 24" FROM FINISH GRADE 6) EXTEND FURNACE VENT TO 3' ABOVE TOP OF INTAKE WHEN WITHIN 10' 7) PROVIDE BONDING OF BLDG GAS |