Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/15/2011 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) RELIEF VALVE MAY NOT BE TRAPPED 2) HARD PIPE WITH APPROVED MATERIALS 3) REMOVE TAPE FROM FLARED JOINTS |
|
| 06/10/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE A MINIMUM OF 12" OF COVER 2) PRIME AND WRAP ALL JOINTS BELOW GRADE 3) TEST ENTIRE SYSTEM 4) LOWER RELIEF DRAIN IN WALL AND CONNECT TO VALVE AT NEW HEATER, CHECK FOR PROPER OPERATION 5) SUPPORT GAS PIPING AT FURNACE: INSTALL SEDIMENT TRAPS, SECURE VENTS WITH SCREWS AND ELECTRICAL BONDING |
|
| 06/07/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) NO ONE HOME 2) ACCESS REQUIRED FOR INSPECTION 3) HAND OUT PROVIDED |