Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/15/2011 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 06/10/2011 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 06/06/2011 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ALL HOSE BIBS REQUIRE VACUUM BREAKERS 2) REATTACH THE BUILDING GROUND WIRE TO THE GROUNDING OVERTREDE 3) USE FITTINGS FOR CHANGES OF DIRECTION OR PROVIDE CORRECT RADIUS FOR BOX TUBING PER MANUFACTURE INSTALL INSTRUCTIONS. 4) PROVIDE 18" MINIMUM IN WALL COPPER PIPING AT WATER HEATER 5) SECURE ALL ANGLE STOPS & TUBING AT CORRECT INTERVIALS 6) PROVIDE WATER HAMMER ARRESTERS FOR WASHER BOX WATER SUPPLIES. WHERE IS THE P-TRAP FOR WASHER DRAIN 7) SECURE THE TUBING INTO THE WALL SPACE FOR THE KITCHEN 8) HAVE WATER HEATER ADDED THE PERMIT AND PROVIDE THE CORRECT WATER HEATER INSTALL. FAILURE TO COMPLY WILL RESULT IN REINSPECTION FEE |