Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/29/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/09/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE A FLOOR STRUCTURE THAT WILL SUPPORT THE WATER HEATER (NO SHIMS) AND PROVIDE A DRIP PAN UNDER THE WATER HEATER 2) T & P DRAIN SHOULD TERMINATE IN VISIBLE LOCATION 90 DEGREE DOWN |