Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/15/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/26/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE APPROVED GAS SHUT OFF VALVES AT WATER HEATER AND FURNACE 2) STOVE GAS TO HAVE RIDGID PIPE THRU CABINET PARTITION 3) WATER HEATER TEMPERATURE AND PRESSURE RELIEF TO GRAVITY DRAIN AND BE FUNCTIONAL 4) REMOVE ALL TAPE FROM WATER HEATER AND FURNACE VENT PIPING & VERIFY FASTENERS 5) NOTE: THE FURNACE IS IN NEED OF REPAIR PRIOR TO TURNING IT ON 6) TEST TO BE THRU ENTIRE GAS PIPING SYSTEM 7) PROVIDE PIPE TAPE PRIMER THEN TAPE ALL TOOL MARKS & FITTING UNDERGROUND |