Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE THE REQUIRED ROOF FLASHING FOR VENT THRU ROOF PENETRATION MADE WEATHER TIGHT, FOR CHANGES TO VENT SYSTEM THRU ROOF 2) CONTRACTOR TO PAY REFEE PRIOR TO FINAL INSPECTION |
|
| 06/20/2011 | PLUMBING - FINAL | Cancelled | CANCELLED PER DARLA OF WOODS PLUMBING #682-2233 | |
| 06/20/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CANCELLED |
|
| 06/15/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE DBL WALL THRU CEILING TO TERMINATION POINT 3' ABOVE TOP OF COOLER, MAKE UP DRAFT HOOD AND VENT CONNECTOR |
|
| 06/08/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) READ ALL NOTES FROM 5/9/11 INSPECTION HISTORY AND COMPLY 2) HAVE CONTRACTOR ON SITE FOR INSPECTION, FAILURE TO COMPLY WILL RESULT IN A REINSPECTION FEE |
|
| 05/09/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) EXPOSE ALL NEW GAS PIPING FOR INSPECTION. EXPOSE PIPING RISER AT METER AND BLDG 2) PROVIDE TEST TO ALL APPLIANCE SHUT OFF VALVES ON ENTIRE GAS SYSTEM 3) ALL UNDERGROUND NEW GAS PIPING TO BE FACTORY COATED PIPING WITH ALL TOOL MARKS AND FITTINGS UNDERGROUND COVERED WITH PIPE WRAP PRIMER THEN WRAPPED WITH PIPE WRAP TAPE TO ACHIEVE A 40 MIL THICKNESS WRAP 4) REMOVE ALL TAPE ON WATER HEATER VENT CONNECTORS. PROVIDE FASTENERS AT VENT JOINTS AND PROVIDE MINIMUM CLEARANCES FROM COMBUSTIBLES FOR VENT PIPING 5) PROVIDE BONDING OF GAS PIPING SYSTEM 6) PROVIDE LADDER FOR ROOF TOP VENT INSPECTION 7) LEAVE INSPECTION HISTORY ON SITE 8) WARNED OCCUPANTS OF DANGER OF USING PORTABLE PROPANE BOTTLE IN HOUSE FOR STOVE 9) LIST NOT COMPLETE |