Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/19/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/04/2011 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE A MAX 15 POUND GAUGE 2) T & P RELIEF VALVE DOES NOT WORK 3) PROVIDE A DBL WALL VENT PIPE ON WATER HEATER MINIMUM 5' IN LENGTH 4) PROVIDE 1" CLEARANCE FROM COMBUSTIBLES 5) PROVIDE T & P DRAIN LINE 6) CONNECT NEW GAS LINE TO EXISTING GAS LINE AND TEST THE ENTIRE SYSTEM 7) PROVIDE A YELLOW TRACER WIRE WITH PLASTIC GAS PIPE 8) WHEN CONNECTING TO EXISTING PIPE, DO NOT USE ANY UNIONS IN THE GROUND 9) PRIMER AND TAPE ALL JOINTS |