Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/23/2011 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/24/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CLAMP PIPING |
|
| 05/31/2011 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE 10 PSI AIR TO GAS PIPING SYSTEM 2) WH HAS BEEN RELOCATED AND REQUIRES THE FOLLOWING CORRECTIONS: A SOLID CONCRETE BASE EXTENDING 3 1/2" ABOVE GRADE, SCREWS AT EACH JOINT OF VENTING AND AN OPERATIONAL RELIEF VALVE 3) WATER HEATER AND FURNACE REQUIRE SEDIMENT TRAPS 4) SUPPORT AND SECURE ALL PIPING 5) MISSING ROOF JACK 6) (? REPAIR WHAT) 7) METER IS LOCKED OFF |